ForFutureUse

The asset that owns this configuration-status has been physically modified or built in preparation for a later phase of construction. The signalling system is unaware of this modification and does not control it. Typical example is the addition of a speed indicator that will be taken into service at a later date.

ForFutureUse

The asset that owns this configuration-status has been physically modified or built in preparation for a later phase of construction. The signalling system is unaware of this modification and does not control it. Typical example is the addition of a speed indicator that will be taken into service at a later date.